Yorkshire Groundworks Solutions Ltd
Home
About YGS
Our Services
Case Studies
5th Avenue Primary
Greenfield Way
Delapole Avenue
Thickett Priory
Goals Soccer Centre
Beverley High School
Affordable Homes
Gas Terminal
HullKR
Industrial Unit
Wind Farm Entrance
Health & Safety
Gallery
Jobs
Contact us

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Tel: 01482 829979       Fax: 01482 822792       Email: info@ygsonline.com
Hull KR
Gas Terminal
Gas Terminal
Gas Terminal

Client’s Requirements
Hobson Porter Ltd approached us to work on the prestigious new North Stand to Hull Kingston Rovers’s Craven Park stadium, they required a contractor to take on the sizeable groundworks package on a labour, plant & materials basis. They required a contractor who was flexible enough to deliver the contract in time for the upcoming Rugby League World Cup.

Delivery
The project required us to work with the client & their numerous other sub-contractors in a flexible manner to keep to the main programme, the project required 5 visits to first assist with the site set up, then construct the foundations, then drainage & services & finally the externals. In between these activities the steel frame, precast concrete stand & internal works were mainly completed.

Yorkshire Groundworks Contribution
Our Groundworks package included:-

  • Foundations – 600m3 of reinforced pilecaps & groundbeams to the new stand & ancillary building using the corriform© formwork system
  • Drainage – 920m of underground drainage for foul & surface water including installation of hydrobrake manholes & 3 precast outlet swales into stormwater lagoons, also 200m of Channel Drainage to hardstanding areas
  • Services – 450m of underground services around site & 4 large foundations (3m deep) for new floodlight pylons around the pitch
  • Externals – 400m of kerbing to new car park areas & 1200m2 of high quality paving around the new stand & ancillary building

Project Outcome
The client was able to deliver the project in time to host the Rugby League World Cup Pool Games as planned, additionally we completed the works with only 1 kerb to replace as a snagging item over the course of this sizeable project.

   
   
Return to the Casestudies homepage
Download PDF
About YGS
YGS Services
Contact us
For more infomation please call the office on 01482 829979
or email us at info@ygsonline.com
HBSGCHASConstruction Online
Copyright 2010 © Yorkshire Groundworks Solutions Ltd
19a Lake Enterprise Park, Bergen Way, Sutton Fields Industrial Estate, Hull HU7 0YQ
Designed by Graficstudio